Meeting 7 Minutes:
2/12/11
GROUP: Continued Animation; RENDERING!!!!!!!!!!!, Cameras and Lighting.
Everybody in the group began to convert their files into smaller segments to begin rendering and the editing process.
All: Camera Work within our Environment. We made a decision to re-animate scenes 1 and 2 with improved lighting and biped work.
Andrew: Continuing Animation of Scene 2 (building resurrection)
(Upper Floor and Roof) , Lighting - placing lights throughout building.
This scene had to be done several times as at times we needed to ensure consistency with lighting was effective.
GROUP: Continued Animation; RENDERING!!!!!!!!!!!, Cameras and Lighting.
Everybody in the group began to convert their files into smaller segments to begin rendering and the editing process.
All: Camera Work within our Environment. We made a decision to re-animate scenes 1 and 2 with improved lighting and biped work.
Andrew: Continuing Animation of Scene 2 (building resurrection)
(Upper Floor and Roof) , Lighting - placing lights throughout building.
This scene had to be done several times as at times we needed to ensure consistency with lighting was effective.
Hong: Made Pencil and Rubber, re-did hand, radio light technique. Biped Rig
Animating: Scene 1 and Scene 3 (walkthrough) - with Steve
Again ... all of our scenes had to be re-done a few times to ensure item and lighting consistency.
Steve: Group Blog, Animating work on scene 3 (footsteps) for walkthrough segment.
Premiere Pro Editing work, Rendering, Created original audio composition for animation.
Animating: Scene 1 and Scene 3 (walkthrough) - with Steve
Again ... all of our scenes had to be re-done a few times to ensure item and lighting consistency.
Steve: Group Blog, Animating work on scene 3 (footsteps) for walkthrough segment.
Premiere Pro Editing work, Rendering, Created original audio composition for animation.
Rendering Scenes, Animating Scene 1 with Hong.